Photovoltaic power station Rechitsa
Development of feasibility study, sections ‘Technological Solutions’, ‘Energy Efficiency’, ‘Investment Efficiency’, ‘Conclusions and Proposals’ of the investment justification and business plan of the investment project: ‘Photovoltaic Station at the Headworks of RUE “Production Association ”Belorusneft’.
Application of photovoltaic modules with a three-row arrangement of modules on the site.
Application of photovoltaic modules with two-row arrangement of modules on a site
Application of photovoltaic modules with single-row arrangement of modules on a site
Comparative analysis of 2 PV power plants using PV modules with peak power of 250 W and 270 W, respectively, under the conditions of maintaining the same total power of the plant
Installation of support elements on the basis of tubing pipes by vibro-immersion method.
Installation of tubing support elements using concrete foundations.
Installation of support elements based on S-shaped galvanised profiles using the vibratory immersion method.
Installation of support elements on the basis of S-shaped galvanised profile using screw supports.
Location of the 110 kV substation in the electrical loads (tentatively the central part of the FES site) or location at the edge of the site (Annex 1) with a minimum distance to the 110 kV overhead line ‘Rechitsa-Volodarsk’ to which the connection is made.
While working on the project, we used Teamviewer for coordination and Skype for communication. The team of ENECA was very flexible, diligent and client-oriented. Though there were some difficulties with communication and work flow at the beginning, we managed to establish a well-coordinated process afterwards. Work with ENECA was a good alternative to the direct hiring locally. I would recommend working with ENECA as your reliable outsourcing partner.