Find
img
All-season indoor skiing arena, Belarus, Minsk
img
Scientific Research Institute, Uzbekistan, Tashkent, S = 20 000 sq.m
img
Multifunctional logistics complex Wildberries, Minsk, Belarus, S=135,000 sq.m.
Individual
Approach
The projects developed by our company easily implement even the most ambitious architectural and engineering intents. 
Design experience in various fields has been the primary specialisation of ENECA for more than 20 years. We are here to create unique and technologically advanced projects using BIM (Building Information Model).
Immersive design encompassing all aspects, utilizing cutting-edge BIM technologies at every level of LOD
img img img img img img img img img img img img
50+
projects
implemented
20+
years of experience
8+
countries
350 000 sq. m.
faclity design
scope
DESIGN STAGES
02. Basic and Detailed Design Documentation
More details
03. Technical and Engineering Support
More details
Work methods and process
1. Concept
We assess your expectations for profitability and payback period, your anticipated budget, and the selected land plot. Based on these data, we offer several architectural and planning options within the selected class. We estimate the scope of work to create the necessary infrastructure. At the final stage of project preparation you will receive not only schemes and drawings, which are necessary for builders and supervisory services, but also high-quality illustrations. They will help you for marketing purposes and allow you to visualise the building's appearance even before construction begins.
2. Pre-design works
These may include geological and environmental surveys, verification of the legal status of the site, determination of logistical indicators of the area, transport accessibility, etc. Development of terms of reference based on the obtained information, we determine the floor and area of the object, its architectural appearance, layout. What materials and technologies should be used in the construction process. What works are to be carried out on the adjacent territory. Development of Terms of Reference
3. Conceptual design
At this stage, we can assess how well the building looks in a particular neighbourhood and whether it contradicts urban planning norms. At the sketch stage, fundamental issues related to the architecture of the structure are resolved. The customer will be able to assess in general terms the appearance and functionality of the object.
4. Detailed design documentation development
At these stages all architectural, volume-planning, engineering and technical solutions are specified. Methods of fire safety, accessible environment are detailed. The work on territory improvement is planned. Design documentation is submitted for approval to the relevant authorities. The working design includes detailed sweeps, schemes of all units, drawings of the facade part, engineering networks (from water supply to telephony and signalling), interiors.
5. BIM
BIM technologies are used to solve complex tasks in the design of administrative facilities, which help us to assess the cost-effectiveness of the project at an early stage, to find the best option between the cost of the facility, its aesthetics and convenience for the customer. At the same time, the customer has the opportunity to see a complete model of the future facility and evaluate architectural and construction solutions.
they trust us
Client
Stamy Booking GmbH
Location
Under NDA
We wanted to explain our service in an easy and understandable way. For this purpose, we decided to use an animation video. ENECA supported us, and we have enjoyed working with supportive and friendly team!
Client
McDonald’s, Burger King, Texas Chicken, KFC
Location
Belarus, Minsk
Category
Restaurant

ENECA, commissioned by Burger BK LLC, has completed design documentation for the modernization of a specialized building for the opening of the Burger King facility. ENECA, commissioned by ALS-FastFood LLC, under the project management of the engineering organization ProlaynTSK LLC, has completed design and estimate documentation for the modernization of the cafe premises for the opening of the Texas Chicken fast food chain facility.

View feedback